Deviation Management

0

 

Deviation Management

 

1.0           Purpose

1.1          To evaluate, control and document the deviations (and batch deviations, reprocessing for approval or rejection) to ensure that product quality, safety, purity and efficacy is maintained and the activities are in accordance with the frame work of cGMP. And It also ensures that the investigation (if required) is carried out, recorded and any cause or causes identified and necessary corrective and preventive measures are taken. If required to bring the deviation under the notice of the concerned management of NAME Pharmaceuticals Ltd.

 

2.0           Scope

2.1         This SOP is applicable for all products, chemicals & packaging materials, the processes, systems, equipment’s, instrumentation, utilities and facilities used to produce and control them and be followed by all departments of NAME Pharmaceuticals Ltd.

 

3.0           Responsibility

3.1         Head of Quality Assurance or His / Her Nominee:

1.     Review deviations in relation to their impact on quality and GMP compliance.

2.     Ensure this procedure covers the initial identification, assessment, investigation (if required), report preparation and remedial action proposal to prevent recurrence.

3.     Ensuring that the system for investigation of failure and the effectiveness of corrective actions is managed and monitored.

4.     Review of any Environmental, Health or Safety implications from the deviation.

5.     Implement decision regarding remedial action through change control (if required), if required             Regulatory for those batch deviations having potential regulatory impact.

6.     Ensure the documentation of all deviation records for the trend analysis of deviations.

 

3.2         Originator:

1.     Ensuring that the details, including any immediate action taken, of the occurrence of a deviation are recorded at the time of the incident and any further action is agreed with the Departmental Manager.

 

3.3         Departmental Manager / Head / In-Charge

1.     Ensuring that Head of Quality Assurance or His / Her Nominee are informed promptly and that in conjunction with any / or other relevant function, assessing whether there is impact on product quality and / or regulatory compliance. Ensuring that any immediate actions taken are appropriate, discussing with the above and the details of the occurrence has been reported.

2.   Authorizing any Corrective Actions and ensuring any Preventative Actions are identified and completed against an agreed time scale.

3.     Ensuring that the deviation is logged, monitored and assessed and summaries provided.

3.4         Investigation Team

1.   An investigation team should be constituted comprising members from Quality Assurance / Control and Other Department(s) depending on the nature of the deviation.

2.     Ensuring that an investigation is carried out, this will establish the cause (root cause), scope and impact of the deviation.

3.     Ensuring that the investigation team comprises relevant experts.

4.     Ensuring that all aspects of investigation are carried out and reported to an agreed time scale

5.     Ensuring that any actions required to prevent recurrence are identified.

 

4.0           Abbreviations and Definitions

4.1            Deviation:

Any planned or unplanned event or failure from Standard Operating Procedure and or failure to meet specified limits. This may include, but is not limited to:

Ø  Alert / Action Limits exceeded.

Ø  Instrument outside of its calibration date and / or tolerance.

Ø  Environmental results outside of specification.

Ø  Deviation from SOP or processing limits in manufacture or testing.

Ø  Process, equipment, procedure or system failure.

Ø  Material accountability discrepancy.

Ø  Damage in storage or handling.

Ø  Out of Specification result.

Ø  Component / supplier problem

Ø  Operator errors.

 Batch Deviation is a change in the process in the Batch Manufacturing Record. Planned   deviations which are preauthorized changes in the process must not be done on an ongoing basis. Unplanned deviations occur during the process running.

Deviation must be recorded, investigated (if required), reported, and included in any monitoring / trending information; note that, product rejection may or may not result. The deviation can be classified as follow.

 

4.1.1.    Critical Deviation

If the unplanned deviation that has anticipated a serious impact on product quality which could cause either adverse health consequence or regulatory impact and needs urgent attention of all departments concerned, will investigate through investigation committee, prior to any decision about release or reject.

4.1.2.      Major Deviation

The unplanned deviations that having an impact on product quality and therefore need to be thoroughly evaluated and investigated prior to any decision about release or reject through investigation committee.

4.1.3.      Minor Deviation

Minor deviations are those which are unplanned deviation, are not critical to product quality, need to be documented, reviewed and approved.

4.2            Fail / Reject

The status of a product or material, which has either directly or indirectly been the subject of a deviation / failure investigation, and the scientifically justified outcome of the investigation is that the product / material does not meet either its Quality specification(s), or comply with registered information.

4.3            Investigation

The systematic process by which the deviation and supporting evidence is examined to    determine causal factors, the root cause, the impact on product / batch / material quality, established, corrective actions required determined, and a documented report generated.

4.4            Immediate Action

Actions taken at the time of an incident to make the process / product / system / material safe and secure, and / or prevent further deterioration.

4.5            Corrective Action

Remedial action taken at the time of the event or identified as part of the (root cause) investigation, that is necessary to recover the product / process / material / system, affected by the deviation.

4.6            Preventative Action

Actions identified as part of the (root cause) investigation, which must be carried out to prevent the Non-conformance recurring. Preventative actions may or may not be completed prior to a decision on batch disposition.

4.7            Reprocessing    

The treatment of all or a part of a batch of product of an unacceptable quality from a defined stage of production with the original process so that its quality may be rendered acceptable by one or more additional operations.

 

5.0           Materials and Equipment

5.1            None

 

6.0           Precaution / Health and Safety Considerations

6.1            None

 

7.0           Procedure

7.1           Numbering and Logging of Deviation

7.1.1        Record the deviation in details in the Deviation Logbook (Annexure-II) and update the records and maintain as the investigation proceeds. Details to be completed in the log include:

Ø  Date of occurrence

Ø  Reference number - Unique reference number (described in the following section 7.1.2)

Ø  Product / Material / Equipment name

Ø  Batch / Code / ID number of the corresponding above name

Ø  A single sentence summary statement of the details of the deviation

Ø  Investigation close out date (investigation is required or not) - Agreed time scale for

      corrective actions or investigation close out date.

Ø  Further investigation closed date – Date of confirmation of completion of corrective

actions or further investigation closed date.

Ø  Where or not product failure is implicated.

Ø  Close out date of preventive actions - Agreed time scale for preventive actions

Ø  Preventive Actions closed date - Date of confirmation of completion of preventative action

Ø  Final close out date.

State N/A where any column is not required to fulfil.

7.1.2        Follow the unique reference number format as following:

 

            D/DC/ XXX/YY

 

            D          =          Deviation

            DC       =          Department Code

         XXX      =       Three-digit sequential number, commencing 001, taken as the next sequential number from the logbook

YY        =          Last two digits of the current year.

 

 

 

            Deviation Department Codes (DC):

 

Department Name

Abbreviated Department Code

Quality Assurance

QA

Quality Control

QC

Microbiology

MB

Production

PR

Engineering

EN

Warehouse

WH

Product Development

PD

 

 

7.2           Deviation Identification, Action Taken and Notification

7.2.1      When any deviation /incidents come to the notice of any personnel, the observer will immediately stop the operations and notify the incident to Head of concerned department, who discuss the matter with Head of Quality Assurance or His / Her Nominee.

7.2.2        Collect data / information pertaining to the deviation, and review the Departmental Manager, who will confirm the occurrence of the deviation.

7.2.3        Notify Head of Quality Assurance or His / Her Nominee regarding the deviation. Discuss the type of the deviation considering the impact on the product quality.

7.2.4        On agreement of the deviation, raise a Deviation Management Form (Annexure-III) with the next sequential unique reference number taken from the deviation logbook (Annexure-II)

7.2.5        Complete the Deviation Management form (Annexure-III).

7.2.6        Review and assess the type of the deviation weather the deviation is critical or major or minor type.

7.2.7    Minor deviations are needed to be documented, reviewed and approved by the Head of Quality Assurance or His / Her Nominee.

7.2.8        Investigate the major and critical type deviation prior to any decision about release. But if Head of Quality Assurance or His / Her Nominee decides to investigate the issue then the deviation will be investigated prior to any decision about release.

7.2.9      During investigation find out the root cause and also identify corrective and preventive actions necessary. If the root cause could not be identified then the investigation committee will decide the further action to be taken.

7.2.10      Take decision regarding the fate of the batch such as approval or rejection. If approved, take decision that additional testing, stability evaluation or validation or reprocessing is required or not.

7.2.11      Write the procedure for reprocessing of batches that do not conform to standards or specification. Get approval of the procedure of reprocessing from Head of Quality Assurance or His / Her Nominee and also follow change control procedure if the reprocessing steps are being permanent for the future.

7.2.12      Reprocessing procedure must define steps to be taken to ensure that the re-processed batches will conform with all established standards, specifications and characteristics and assess regarding process validation and stability implications.

7.2.13      Reprocessing of product is exceptional and must not be done on a routine basis.

7.2.14    Decide whether additional testing, stability evaluation of reprocessed batch is required or not and validation of the product is required or not. 

7.2.15      Special consideration should be given for the need to revalidation.

7.2.16      Archive all records of reprocessing.

7.2.17      Raise change control if permanent change is required.

7.2.18      Keep the product of deviation and or for reprocessing in a separate area.

7.2.19      Evaluate and close out the deviation in a timely manner (normally within 30 calendar days).

7.2.20      Consider that the incomplete step (continuation of a process after an in-process control test) as a part of the normal process, not as reprocessing.

7.2.21      Document supplemental filing to allow for (planned) Reprocessing in the course of commercial Manufacturing, take approval by the Regulatory authority.

7.2.22      Give special consideration for the need to revalidate and for the need to perform additional stability studies.

 

7.3           Conduct Investigation

7.3.1        Appoint an investigation leader and the team to carry out investigation by Head of Quality Assurance or His / Her Nominee.

7.3.2        Complete the investigation in a timely manner. Carry out investigation on the basis / type of the deviation.

7.3.3        Generate a report on completion of the investigation, summarize the outcome, with respect to effect on quality, root cause of the incident, corrective and preventative actions.

7.3.4        The investigation must include the evaluation and suitability of the affected batches for market/clinical use.  

7.3.5        Complete investigations of the deviation within 30 (thirty) working days.

NOTE:

Ø  Head of Quality Assurance or His / Her Nominee must be notified of all Investigations that are open beyond 10 (ten) working days.

 

Ø  Investigations that exceed 10 (ten) working days must be justified and include action plans with time commitments.

 

7.4           Closure, Archiving and Trend Analysis

7.4.1        Detect the recurrent problems.

7.4.2        Implement corrective action or preventative action, if any.

7.4.3        Update the deviation logbook.

7.4.4        Sign the section 8 of Annexure-III with decision and remark to close the deviation report.

7.4.5        Send the completed deviation report and accompanying documents (if any) to Officer /Sr. Officer QA for archival at the deviation file.

7.4.6        Send the photocopy of the completed deviation report to the Department from where the deviation is raised and also attach a copy with the relevant batch manufacturing record.

7.4.7        Include a summary of all deviation in the annual report for trend analysis.

           

NOTE:

Ø  In the event of Out of Specification (OOS) or A typical laboratory results the investigation must follow the relevant SOP - Evaluation of Analytical Test Result and Investigation of Out Of Specification Test Result (OOS)

Ø  The procedure is illustrated as a flow chart in Annexure-I.  

 

7.5           Content of Deviation Management Form (Annexure-III)

7.5.1        Section 1:                                           

 

Originating Department - Name of the originating department raising deviation form

Date – Date of raising deviation form

Date of Incident - Date of deviation occurrence

Incident Batch Linked - Yes / No (tick which is appropriate)

Batches Affected – Batch Nos. of the products that are affected.

 

7.5.2        Section 2:

                                               

            Product Name - Name the product for which deviation is raised 

            Batch Number - Deviation is raised for batch number of the product  

            Date of Manufacturing - Date of manufacturing of the mentioned product / material

Date of Expiry - Date of expiry of the mentioned product / material

            Supplied Material - Name the supplied material for which deviation is raised

            Supplier Lot Number - Deviation is raised for lot number of the supplied material 

            Quantity - Quantity of the batch affected / supplied material 

            Process – Name of the process for which deviation is raised

            Machine - Name of the machine for which deviation is raised

System - Name of the system for which deviation is raised

                       

7.5.3        Section 3:

 

Deviation (detailed description of the deviation, if required use extra page) - Originator will write up the incident of deviation and also write up his name, signature and date.       

 

7.5.4        Section 4:

            Immediate Corrective Action – Mention the decision that was taken an immediate corrective action by originator and departmental manager in consultation with Head of Quality Assurance or His / Her Nominee to make the process / product / system / material secure, to prevent further deterioration. Departmental Manager will write up the Immediate Corrective Action with signature and collect signature from the above person mentioned.

 

7.5.5        Section 5:

            Investigation (if required) and Corrective Action (attach any additional information on a separate sheet) - Investigation Team Leader will write up the Investigation Report and Corrective Action with signature and collect signature from Head of Quality Assurance or His / Her Nominee.

 

7.5.6        Section 6:

            Possible Root Cause and Preventive Action - Investigation Team Leader will write up the Possible Root Cause and Preventive Action in consultation with Head of Quality Assurance or His / Her Nominee with signature. Mention the preventive Action with the person responsible for and the completion date.

 

7.5.7        Section 7:

            Evaluation (Product Impact) - In Head of Quality Assurance or His / Her Nominee will write down the impact of this deviation on the product (considering the investigation report) and corrective action, root cause and preventive action with signature and date.

 

7.5.8        Section 8:

            Closure - In closure the Departmental Manager in consultation with Head of Quality Assurance or His / Her Nominee will decide to accept or reprocess or require additional IPQA / QC test or require further validation / revalidation or stability test or reject with signature. Mention the completion date. Other than the above write it down at the remarks.

 

8.0           Reference Document

8.1         In-house

 

9.0           Annexure

9.1        Annexure-I          : Flow Chart of Deviation Management

9.2        Annexure-II         : Format of “Logbook for Deviation Management

9.3        Annexure-III         : Deviation Management Form

 

10.0        Revision History

 

 

Revision No.

Brief reason for the revision

   Effective Date

   Remarks

01

New

 

 



11.0        Training

11.1       Head of Quality Assurance or his nominee give the training of production operator and worker.

Flow Chart of Deviation Management


Logbook for Deviation Managemen

 

 

Annexure-III

 

Deviation Control Form

 

 

 Section 1                                                 Section 2

Originating Department:

Product Name:

Batch No.:

Date:

Date of Mfg.:                                   Date of Exp.:

Supplied Material:

Date of Incident:

Supplier Lot No.:

Quantity:

Incident Batch Linked:      

               Š Yes /   ŠNo

Process:

 

Batches Affected:

Machine:

System:

 Section 3

Deviation (detailed description of the deviation, if required use extra page)

 

 

 

Originator’s Name:                                             Signature:                               Date:

 Section 4

Immediate Corrective Action

 

 

                                                                                                          

(Departmental Manager)               (Sr. /Officer QA )                   /        (Head of QA)    

 Section 5

Investigation (if required) & Corrective Action (attach any additional information on a separate sheet) 

 

                                                                                                           

(Investigation Team Leader)                    (Sr. /Officer QA )           /       (Head of QA)   

 Section 6

Possible Root Cause 

 

                                             

 Preventive Action

Action

Responsibility

Completion Date

 

  

 

 

 

 

 

(Investigation Team Leader)                    (Sr. /Officer QA )           /     (Head of QA)  

 Section 7

Evaluation – Product Impact 

 

                                                                                                              

(Sr. /Officer QA )                                             /                            (Head of QA)    

 Section 8

Closure (Tick the following):              

Accept

Reprocess

Additional

QA/QC Test

Further Validation/ Revalidation

Stability Test

Reject

Completion Date:

Remarks

 

 

(Departmental Manager)                     (Sr. /Officer QA )              /       (Head of QA)



 

 

 

Post a Comment

0Comments

Post a Comment (0)