Cleaning and Operation of Drum Blender

0
Cleaning and Operation of Drum Blender

 

1.0         Purpose

 1.1       To define a standard cleaning and operation procedure of Drum Blender.


2.0         Scope

2.1         This procedure is applicable for Drum Blender (60 kg) of tablet manufacturing area at “NAME” Pharmaceuticals Ltd.

 

3.0      Responsibility 

3.1.       Only concern operator is responsible for normal operation. He/ She inform the supervisor about any deviation from normal operation. He also maintains logbook.

3.2.       Sr. Officer- Production/Officer- Production is responsible for monitoring day to day activity.

3.3        Production and Quality Assurance Officer shall ensure that the procedure is implemented properly.

 

4.0      Abbreviations and Definitions

4.1        BMR     : Batch Manufacturing Record

 

5.0       Materials and Equipment

 

5.1        Tap water

5.2        Hot water (60⁰ c)

5.3        Purified water

5.4        Hand brush

5.5        Clean lint free cloth

5.6     Detergent Solution / Cleaning agent: 0.4% (w/v) Sodium Lauryl Sulphate solution; 4 gm Sodium lauryl Sulphate is dissolved in 1.0 liter of portable / tap water to prepare detergent solution.

5.7        70 % Isopropyl Alcohol.

 

 

6.0      Precaution / Health and Safety Considerations

6.1         Use mask and hand gloves during operation.

6.2        Check the electric connection before operation.

6.3        The screw of the ring and ribbons of the drum blender should be tightened well.

6.4        Cover the electric switch board and motor with polybag during cleaning.

 

 

7.0       Procedure

 

7.1            Cleaning

 

7.1.1        After working, Switch “OFF” the electric supply.

7.1.2        Empty Drum transfer to the equipment cleaning area.

7.1.3        Remove the lid by loose the bolt fitted outside the lid.

7.1.4        Wipe off residual powder by dry lint free cloth.

7.1.5        Wash with Potable water at least two times till all the residue is washed off.

7.1.6        Use Detergent Solution / cleaning agent & scrub the parts if required.

7.1.7        Finally rinse with purified water.

7.1.8        Wipe off all the parts with 70 % v/v solution of Isopropyl Alcohol (IPA) and allow drying.

7.1.9        Machine operator / worker will request Production Officer and QA Officer for checking visual inspection. 

7.1.10      At first Production Officer will check the machine and its surroundings, then QA Officer will check the machine and its surroundings. If it found satisfactory result, then he / she will issue “Cleaned” label.

7.1.11      Record in Machine logbook and affix the label of “Cleaned” in the machine.

7.1.12     After cleaning the machine if it remains without operation for next 72 hour, will undergo Re-cleaning operation.

 

7.2            Operation 

7.2.1        Production person shall ensure the cleanliness of the machine.

7.2.2     Before starting the operation production person get the line clearance from QA person and affix the status label with Product Name, batch details to equipment.

7.2.3        Ensure that electric supply is disconnected.

7.2.4        Open the lid cover of drum mixer.

7.2.5        Load the materials as per blending procedure mentioned in the BMR.

7.2.6        Put the lid over the loading end and tighten it well with the help of wing nut.

7.2.7        Close the safety guards so that limit switch is operational. Put “ON” the electric supply.

7.2.8         Set the timer for the required time period as per Batch Manufacturing Record.

7.2.9         Rotate the blender for the specified time as per the blending procedure.

7.2.10   When blending is over, switch “OFF” electric supply and get the unloading end in proper position for unloading.

7.2.11       Unload the material by scooping in double poly bag containers.

7.2.12       After unloading affix “To Be Cleaned” label and fill the “Machine Logbook”. (Annexure-I)

8.0      Reference Document

8.1        In-house

 

 

9.0       Annexure     

9.1        Annexure- I   : Format of Machine Logbook

 

10.0    Revision History 

Revision No.

Brief reason for the revision

   Effective Date

   Remarks

01

New

 

 

02

 

 

 

 

 

11.0     Training 

11.1      Head of Production or his nominee give the training of operator and worker.

 

 

Format of Machine Log Book

  

Post a Comment

0Comments

Post a Comment (0)