Operation and Cleaning of Blister Machine

0
Operation and Cleaning of Buchon Blister Machine

1.0         Purpose

1.1           To ensure a standard procedure for smooth operation, proper cleaning and appropriate use of Blister packing machine.


2.0         Scope

2.1      This procedure is applicable for Blister Packing machine of production area at “NAME” Pharmaceuticals

Ltd.

 

3.0      Responsibility

3.1.       Only concern operator is responsible for normal operation. He/ She inform the supervisor  about any deviation from normal operation. He also maintains logbook.

3.2.       Sr. Officer- Production/Officer- Production is responsible for monitoring day to day activity.

3.3        Production and Quality Assurance Officer shall ensure that the procedure is implemented  properly.

 


4.0      Abbreviations and Definitions

 

4.1          BMR     : Batch Manufacturing Record

 

5.0       Materials and Equipment

 

5.1        Tap water

5.2        Hand brush / Plastic Brush

5.3        Clean lint free cloth

5.4        Isopropyl Alcohol.

 

6.0      Precaution / Health and Safety Considerations 

6.1         Regulation and Technical standards of energy supply are to be surely observed.

6.2        The Operator should always be cautious of the position and operating condition of the machine; temperature, degree of humidity, vibration, dust and cleanliness of the room to be occupied.

6.3        The Operator must check all safety mechanism to ensure that they are fully functional.

6.4        The Contact with heated element should be avoided.

6.5        During changeover of the machine handle the heavy change parts very carefully.

6.6        Don’t touch the moving parts of the machine during operation.

6.7        Keep the upper heating and sealing plate in upward position when the machine is stopped.


7.0       Procedure 

7.1        Before starting operation, the operators and the personnel with this operation must ensure that the

            Room is properly cleaned and all materials of previous product are removed. 

7.2        Make sure all the necessary parts and equipment of the Buchon Blister Packing machine in the

            room with proper cleaning. 

7.3        Set the machineries parts for a particular product and prepare for operation in accordance with the

            following procedures

 

7.4       Operation 

7.4.1     Check all the greasing point of the machine.

7.4.2     Supply power and compressed air to the system. Maintain air pressure at min. 6 kg/cm2

7.4.3     Turn “ON” the main power switch.

7.4.4     Open  the main air supply valve.

7.4.5     Supply bottom materials (PVC etc.) into the PVC uncoiler.

7.4.6     Insert cover foil (Aluminum etc.) into cover foil uncoiler. 

7.4.7     Turn on each switch – 1) Heater switch of pre-heating, sealing, slitting.

                                              2) Chiller.

                                              3) Draw-Off

 

7.4.8     Wait till temperature of each heater reaches to the set value;

                        1) Upper and Lower pre-heating (Std.) : 110-180º C

                        2) Sealing                                 (Std.) : 150-200º C

                        3) Slitting                                  (Std.) :  50-100º C

 

7.4.9     Set the AUTO MODE/MANUAL MODE

 

7.4.10   Set the position of followings

            1) Sealing station

            2) Slitting station

            3) Forming station

            4) Cooling station

            5) Embossing station

 

7.4.11   After setting all the necessary parts and programs, check all screw and nuts either they are

 Properly tighten or not. If not tighten all.

7.4.12   Now start to trial the machine whether it is running smoothly or not, if it is ok then run the machine

            for checking the blistered strip and perform leak test.

7.4.13   After ensuring every parameter of the machine is ok, then check the machine and forming blister

            Strip by Production Officer and QA Officer and then start the operation.

7.4.14   During operation perform leak test at one hour interval.

 

7.5       Cleaning

7.5.1     After operation, put off power supply, air supply and other parameters that are necessary to stop.

7.5.2     Remove the removable parts from the main body of the machine and keep aside for proper cleaning.

7.5.3     Remove and isolate the unused primary packing materials and send the returned quantity to packing store.

7.5.4     Remove dust/powder adhering with the removable parts and the main body of the machine with the          clean hand brush, then clean the surface with dampened lint free cloth and again clean with dry clean cloth.

7.5.5     Any power or dust which cannot be removed by means of brush to be clean with solvents like isopropyl alcohol which can be done by dipping clean cotton cloth in the solvent and then the cloth is used to clean the powder or dust adhering with the parts or main body of the machine.

7.5.6     Machine operator / worker will request Production Officer and QA Officer for checking visual inspection.   

7.5.7      At first Production Officer will check the machine and its surroundings, then QA Officer will check the machine and its surroundings. If it found satisfactory result, then he / she will issue “Cleaned” label.

7.5.8      Keep the cleaned parts in dry and cool place and should be kept in the cupboard.

7.5.9      Record in Machine logbook (Annexure-I) and affix the “Cleaned” label on the machine.

7.5.10    After cleaning the machine if it remains without operation for next 72 hour, will undergo Re-cleaning operation.

 

8.0      Reference Document

8.1        In-house

 

9.0       Annexure     

9.1        Annexure- I   : Format of Machine Logbook

 

10.0    Revision History 

Revision No.

Brief reason for the revision

   Effective Date

   Remarks

01

New

 

 

 

 

 

 

 

11.0     Training

11.1      Head of Production or his nominee give the training of production operator and worker.

  