1.0         Purpose

 1.1       To lay down a procedure for the Preventive Maintenance for Fluid Bed Dryer.


2.0         Scope

2.1          This procedure is applicable for the Preventive Maintenance of Fluid Bed Dryer .

 

3.0      Responsibility

3.1.       Only trained Technician/ Engineering Officer is responsible for execution of this procedure.

3.2.       Head of Engineering and Maintenance shall be responsible for the implementation of this SOP.

3.3        Head of QA / designee shall be responsible for compliance of this SOP.

 

4.0      Abbreviations and Definitions

 

4.1        SOP     :           Standard Operating Procedure.

4.2        QA       :           Quality Assurance

4.3        No.       :           Number

4.4        Qty.      :           Quantity

4.5        FBD     :           Fluid Bed Dryer

4.6        EN        :           Engineering

 

5.0       Materials and Equipment

 

5.1        None

 

6.0      Precaution / Health and Safety Considerations 

6.1        Used necessary safety wears doing the work.

6.2        Ensure covers and guards are properly fixed.

 

7.0       Procedure

7.1.        General Conditions

7.1.1      Refer the master plan of preventive maintenance.

7.1.2      Equipment shall be available for preventive maintenance.

7.1.3      Clean oil / grease stain and remove unwanted materials, spares after completion of work.

7.2.        Procedure for Preventive Maintenance of Fluid Bed Dryer

7.2.1      Ensure that electrical supply is in off position in main panel and display “Under Maintenance” on the panel

 board and guard are properly fixed.

7.2.2      The Technician or above has to ensure and verify the check points for the preventive maintenance as shown 

in the Annexure-I and Annexure- II.

7.2.3      After the completion of preventive maintenance, check the machine for smooth operation.

7.2.4      Remove “Under Maintenance” on the panel board after completion of the Maintenance.

7.2.5      The Technician perform the job will enter his name / sign in “Done by” column and responsible Engineer / 

Officer, Production will put sign in “Checked By” column.

7.2.6      Quarterly maintenance will include the jobs of monthly maintenance, half yearly Maintenance will include the 

jobs of monthly and quarterly maintenance and year maintenance will include the jobs of monthly, quarterly, half

 yearly and yearly maintenance.

7.3         Monthly preventive maintenance is to be carried out as per the following check points:

7.3.1      Check and tight the foundation bolt of bottom body all exposed nut and bolts.

7.3.2      Clean the FBD filters as per respective SOP.

7.3.3      Check all the roller of product container trolley for any jam problem. Change the roller bearings, if needed.

7.3.4      Tighten all the electrical connections and clean the electrical panel with hand blower.

7.3.5      Check all pneumatic pipes and valves for any leakage of air, if found damaged, replace the same.

7.3.6      Check the filter bed supporting hanger (hook) for any damage.

7.3.7      Check the supporting mounting bolt of lowering cylinder of filter bag housing.

7.3.8      Check all clamping bolts of ducting system (Inlet and Outlet ducting).

7.3.9      Check the motor terminal connections and tighten the same.

7.3.10    Check all the clamps of product container and tight them, if required.

7.3.11    Check the following gasket for any damage: Gasket between retarding chamber and product container, 

gasket for explosion flap, “O” ring for butterfly valve.

7.4         Quarterly preventive maintenance is to be carried out as per the following check points:

7.4.1      Check the filter bag shaking cylinder for any leakage of air. (if required, air seal is to be changed).

7.4.2      Checked the pneumatic cylinder for any air leakage. (If required, replaced pneumatic Cylinder piston “o” ring and 

sealing gasket)

7.4.3      Check and clean air heater, air inlet and air outlet.

7.4.4      Check the proper Earthing.

7.5         Half yearly preventive maintenance is to be carried out as per the following check points:

7.5.1      Check and tighten the blower motor terminal connection.

7.5.2      Check the blower impeller for proper balancing.

7.5.3      Check the entire solenoid valve with coil. (If required, change the solenoid valve and coil).

 

7.6         Yearly preventive maintenance is to be carried out as per the following check points:

7.6.1      Check the main switch, fuse and switch contacts of test lines for continuity.

7.6.2      Check interlocking of process timer.

7.6.3      Check pressure relief flap.

7.6.4      Check all electrical connection (control panel, all motors) for any loose connections, burned contracts,

signs of overheated wires, tighten / replace the same.

  

8.0      Reference Document 

8.1        In-House, 

 

9.0       Annexure      

9.1        Annexure –I      :           Preventive Maintenance Checklist of Fluid Bed Dryer (monthly)

9.2        Annexure –II      :           Preventive Maintenance Checklist of Fluid Bed Dryer

                                                       (     Quarterly /      Half Yearly /     Yearly)

 

10.0    Revision History 

Revision No.

Brief reason for the revision

   Effective Date

   Remarks

01

New

 

 

 

11.0    Training 

11.1      Head of Engineering and Maintenance or his nominee give the training of Technician and Operators

 

 

 

Annexure –I

Preventive Maintenance Checklist of Fluid Bed Dryer (monthly)

 

Area :

 

Date:

 

Equipment No :

 

Frequency:

Monthly

Sl. No.

Description of the Job

Observation

Corrective Action

Spared Used

1.

Before starting Preventive Maintenance of FBD “switch off” the panel board.

Š Ok  /  Š Not Ok

 

 

2.

Put “Under Maintenance” on panel board.

Š Ok  /  Š Not Ok

 

 

3.

Check and tight the foundation bolt of bottom body all exposed nut and bolts.

Š Ok  /  Š Not Ok

 

 

4.

Clean the FBD filters as per respective SOP.

Š Ok  /  Š Not Ok

 

 

5.

Check all the roller of product container trolley for any jam problem. Change the roller bearings, if needed.

Š Ok  /  Š Not Ok

 

 

6.

Tighten all the electrical connections and clean the electrical panel with hand blower.

Š Ok  /  Š Not Ok

 

 

7.

Check all pneumatic pipes and valves for any leakage of air, if found damaged, replace the same.

Š Ok  /  Š Not Ok

 

 

8.

Check the filter bed supporting hanger (hook) for any damage.

Š Ok  /  Š Not Ok

 

 

9.

Check the supporting mounting bolt of lowering cylinder of filter bag housing. flap, “O” ring for butterfly valve.

Š Ok  /  Š Not Ok

 

 

10.

Check all clamping bolts of ducting system (Inlet and Outlet ducting).

Š Ok  /  Š Not Ok

 

 

11.

Check the motor terminal connections and tighten the same.

Š Ok  /  Š Not Ok

 

 

12.

Check all the clamps of product container and tight them, if required.

Š Ok  /  Š Not Ok

 

 

13.

Check the following gasket for any damage: Gasket between retarding chamber and product container, gasket for explosion

Š Ok  /  Š Not Ok

 

 

 

 

………………………………….

Done By

 

………………………………….

Checked By

 

 

Annexure –II

Preventive Maintenance Checklist of Fluid Bed Dryer

(     Quarterly /     Half Yearly /     Yearly )

 

Area :

 

Date:

 

Equipment No :

 

Frequency:

 

Sl. No.

Description of the Job

Observation

Corrective Action

Spared Used

1.

Before starting Preventive Maintenance of FBD “switch off” the panel board.

Š Ok  /  Š Not Ok

 

 

2.

Put “Under Maintenance” on panel board.

Š Ok  /  Š Not Ok

 

 

Quarterly

3.

Check the filter bag shaking cylinder for any leakage of air.(if required, air seal is to be changed).

Š Ok  /  Š Not Ok

 

 

4.

Checked the pneumatic cylinder for any air leakage. (if required, replaced pneumatic Cylinder piston “o” ring and sealing gasket)

Š Ok  /  Š Not Ok

 

 

5.

Check and clean air heater, air inlet and air outlet.

Š Ok  /  Š Not Ok

 

 

6.

Check the proper Earthing.

Š Ok  /  Š Not Ok

 

 

Half Yearly

7.

Check and tighten the blower motor terminal connection.

Š Ok  /  Š Not Ok

 

 

8.

Check the blower impeller for proper balancing.

Š Ok  /  Š Not Ok

 

 

9.

Check the entire solenoid valve with coil.(if required, change the solenoid valve and coil).

Š Ok  /  Š Not Ok

 

 

Yearly

10.

Check the main switch, fuse and switch contacts of test lines for continuity.

Š Ok  /  Š Not Ok

 

 

11.

Check interlocking of process timer.

Š Ok  /  Š Not Ok

 

 

12.

Check pressure relief flap.

Š Ok  /  Š Not Ok

 

 

13.

Check all electrical connection (control panel, all motors) for any loose connections, burned contracts, signs of overheated wires, tighten / replace the same.

Š Ok  /  Š Not Ok

 

 

 

 

………………………………….